top of page
This site was designed with the
.com
website builder. Create your website today.
Start Now
JESSICA GOLDBERG
HOME
COORDINATION
Project Scheduling
Cost Estimation
Team Coordination
Risk Analysis
CALCULATION
Structural Analysis
Electrical Analysis
Hydraulic Analysis
Computing Analysis
Materials Analysis
Financial Analysis
CREATION
Scenic Design
Lighting Design
Robotics
Entertainment Design
Design With Regulations
Digital Design
Mechanical Design
FABRICATION
Nonparametric 3D
Parametric 3D
Arduino/Sewing
Laser Cutting
Carpentry and Manufacturing
ABOUT ME
More
Use tab to navigate through the menu items.
JESSICA GOLDBERG
THEATRE ENGINEER
COORDINATION
Project Scheduling
Developing schedule documents for a theoretical stage production.
Cost Estimation
Paperwork determining budget for 2022-2023 TEDxPurdueU event.
Team Coordination
Project Management work for the Student Themed Entertainment Project that occured over the summer of 2020
Risk Analysis
Analysis of risks in the development of the structural components of a trap door
bottom of page